03 — Method

How we work

Six stages from mobilisation to the end of the defects period. Each one has an output you can hold — a document, a signed hold point, a dated programme.

Demonstration method for a fictional contractor.

Project team reviewing programme and drawings around a table
  1. S-01Day 0

    Mobilisation

    Site established before work starts.

    Access, storage, ablutions, protection of finished surfaces and a site induction for every person who will set foot on the property.

  2. S-02Before pricing

    Scope

    A written scope with nothing implied.

    Every line item priced, measured and described. If it is not in the scope it is not in the price, and both of us know that on day one.

  3. S-03Weekly update

    Programme

    Dates you can plan your life around.

    A dated bar programme with the critical path marked, issued before deposit, updated weekly against actual progress.

  4. S-04Daily record

    Build

    One site manager, one accountable line.

    Directly employed crews for structure and finishes, vetted specialists for the rest, all reporting through the same site manager.

  5. S-05Hold points

    Quality control

    Hold points, not hopeful inspections.

    Defined hold points where work stops until it is checked and signed. Photographic record against each one, issued to you.

  6. S-06Defects period

    Handover

    A closed file, not a vanished contractor.

    Snag list closed in writing, compliance documents handed over, warranty issued, and a return visit booked at the end of the defects period.

Ref 03.1 — Quality control

Hold points, filmed and signed

Work stops at a hold point until it is inspected. Foundations before backfill, waterproofing before screed, structure before cover-up. Nothing gets buried on a promise.

Site walk-through inspection with the client and site managerSite foreman in hard hat and safety gear on an active build

Ref 03.2 — Mobilisation

What day one looks like

Before a single brick moves, the site is set up: access agreed, protection down, induction done, programme on the wall.

Construction crew placing and levelling a concrete slab pourProject team reviewing programme and drawings around a table

Tell us what needs building.

Ten short steps, a written scope summary, and a site visit booked around your week. Demonstration form — nothing is sent.

Build your scope
More templates