07 — Site notes

Site notes

Short, practical guidance written for homeowners, landlords and business clients who are about to appoint a contractor.

Demonstration editorial content.

Public plaza and civic buildings in the Johannesburg city bowl
Site walk-through inspection with the client and site managerN-01

Before you build · 4 min

How to prepare for a site visit

Clear access, find the plans, know where the water and electrical connections are, and write down what you actually want changed. A prepared site visit produces a quote in days instead of weeks.

Project team reviewing programme and drawings around a tableN-02

Quoting · 6 min

What makes a quote complete

A complete quote names the materials, the quantities, the exclusions and the programme. If a quote fits on half a page, the missing half is going to arrive later as a variation.

Interior window and finishing work in progress on a buildingN-03

Sequencing · 5 min

Renovation sequencing without the rework

Wet works before screed, electrical first-fix before plaster, glazing before paint. Most renovation overruns are sequencing failures, not skill failures.

Technician installing rooftop solar photovoltaic panelsN-04

Sequencing · 5 min

Solar and roof work belong in one contract

Mounting a PV array on a roof that needs replacing in three years costs you the install twice. Assess the roof structure and the waterproofing before the panels are ordered.

Close detail of masonry setts laid against a face-brick wallN-05

Before you build · 4 min

Paving: the base is the job

Blocks are the cheap part. Sub-base depth, compaction and edge restraint decide whether the surface is still flat in five years. Ask what is going under the paving, not just over it.

Timber and steel roof truss framing set out over a structureN-06

Documentation · 6 min

The documents a contractor should hand you

Compliance certificates, test results, warranty terms, as-built marks and a closed snag list. If the file is thin at handover, the risk quietly transfers to you.